<?xml version="1.0" encoding="utf-8" standalone="yes"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Subcontracting on Product Documentation</title>
    <link>https://bc.help.be-terna.com/en-us/docs/business-central/cross-industry-solutions/manufacturing/subcontracting/</link>
    <description>Recent content in Subcontracting on Product Documentation</description>
    <generator>Hugo</generator>
    <language>en-US</language>
    <atom:link href="https://bc.help.be-terna.com/en-us/docs/business-central/cross-industry-solutions/manufacturing/subcontracting/index.xml" rel="self" type="application/rss+xml" />
    <item>
      <title>Prices</title>
      <link>https://bc.help.be-terna.com/en-us/docs/business-central/cross-industry-solutions/manufacturing/subcontracting/prices/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      <guid>https://bc.help.be-terna.com/en-us/docs/business-central/cross-industry-solutions/manufacturing/subcontracting/prices/</guid>
      <description>&lt;h2 id=&#34;purpose&#34;&gt;Purpose&lt;/h2&gt;&#xA;&lt;p&gt;For subcontracting purchase orders, prices directly on the operation are often not enough. Subcontractors may offer quantity tiers, use different currencies, or agree on prices by item and vendor. BE-terna Manufacturing adds &lt;strong&gt;Subcontracting Prices&lt;/strong&gt;, which are evaluated when the production order routing is calculated.&lt;/p&gt;&#xA;&lt;h2 id=&#34;business-value&#34;&gt;Business Value&lt;/h2&gt;&#xA;&lt;ul&gt;&#xA;&lt;li&gt;Subcontracting prices can be maintained by vendor, work center, item, quantity, currency, and validity period.&lt;/li&gt;&#xA;&lt;li&gt;Quantity tiers are represented through different minimum quantities.&lt;/li&gt;&#xA;&lt;li&gt;Prices can be viewed from item, vendor, work center, or subcontracting worksheet contexts.&lt;/li&gt;&#xA;&lt;li&gt;The determined price is transferred into the current production order routing.&lt;/li&gt;&#xA;&lt;li&gt;Production order statistics show the determined values as &lt;strong&gt;Subcontracted Cost&lt;/strong&gt;.&lt;/li&gt;&#xA;&lt;/ul&gt;&#xA;&lt;h2 id=&#34;maintain-subcontracting-prices&#34;&gt;Maintain Subcontracting Prices&lt;/h2&gt;&#xA;&lt;ol&gt;&#xA;&lt;li&gt;Open the &lt;strong&gt;Vendor&lt;/strong&gt; for which you want to maintain a subcontracting price list.&lt;/li&gt;&#xA;&lt;li&gt;Choose &lt;strong&gt;Related &amp;gt; Purchase &amp;gt; Subcontractor Purch. Prices&lt;/strong&gt;.&lt;/li&gt;&#xA;&lt;/ol&gt;&#xA;&lt;p&gt;The &lt;strong&gt;Subcontractor Purchase Prices&lt;/strong&gt; page opens. &lt;strong&gt;Vendor No.&lt;/strong&gt; is already filtered to the current vendor.&lt;/p&gt;</description>
    </item>
    <item>
      <title>Component Provision</title>
      <link>https://bc.help.be-terna.com/en-us/docs/business-central/cross-industry-solutions/manufacturing/subcontracting/component-provision/</link>
      <pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate>
      <guid>https://bc.help.be-terna.com/en-us/docs/business-central/cross-industry-solutions/manufacturing/subcontracting/component-provision/</guid>
      <description>&lt;h2 id=&#34;purpose&#34;&gt;Purpose&lt;/h2&gt;&#xA;&lt;p&gt;In subcontracting, manufacturing companies need a clear link between the purchase order for the subcontractor and the transfer order for the components that must be shipped to the subcontractor location. Standard Business Central does not provide a direct connection between these documents. BE-terna Manufacturing adds &lt;strong&gt;Purchase Transfer Link Lines&lt;/strong&gt; for this purpose.&lt;/p&gt;&#xA;&lt;p&gt;This link shows which purchase order and transfer order belong together. It can also support a shipment document for the subcontractor that includes both purchase order number and transfer order number.&lt;/p&gt;</description>
    </item>
  </channel>
</rss>
