LSC production and output feedback
Purpose
This page describes the production-related LSC process from component staging to structured output reporting.
Component staging
The staging process controls which package units are made available for production.
Key points:
- filter by production order or staging location,
- define required quantity from business perspective,
- create staging activities,
- monitor coverage status actively.
Production output feedback
Operational feedback is processed through Production Backflush.
Typical flow:
- Select production order and line.
- Validate alternative packaging structure.
- Maintain Number of Singles and Output Quantity.
- Set Lot No. where lot logic is mandatory.
graph LR;
%% Nodes
A["Create production<br/>order"]
B["Plan component<br/>staging"]
C["Load staging<br/>location"]
D["Release packages<br/>to production"]
E["Consume components<br/>physically"]
F["Run production"]
G["Prepare output<br/>feedback"]
H["Run Production<br/>Backflush"]
I{"Packaging<br/>required?"}
J["Pack output as<br/>handling unit"]
K["Complete output<br/>posting"]
L["Finished packages<br/>available"]
%% Flow
A -.- B
linkStyle 0 stroke:#ffffff
B ==> C
C ==> D
D ==> E
E ==> F
F ==> G
G ==> H
H ==> I
I ==>|Yes| J
I ==>|No| K
J ==> K
K ==> L
%% Classes
class A btProcessTitle
class B,C,D,E,F,G,H,I,J,K,L btProcessActive
- Finish feedback through Register/Finish actions.
Packaging-structure and quantity rules
- Single/master logic must match active structure.
- Partial quantities must be transferred consistently into package hierarchy.
- Resulting activity depends on QA requirement and target process.
Component consumption
Depending on setup, consumption follows FEFO/FIFO or allocation sequence. Blocked packages must not distort consumption behavior.
Checkpoints
- staging and target locations are plausible,
- packaging structure is correct before feedback,
- lot/date fields are complete,
- feedback postings have no unresolved conflict activities.